Film the Coffee Shop Scene

I have booked Smiley’s for Saturday, April 22nd 8 am to 6 pm.
If you are available, please let me know by the contact form.
Let me know what position(s) you are interested in.

Trusting in God’s direction I believe we can do this scene in one day! Here is what we need…

  • 5 Actors
    • 3 Female
    • 2 Male
  • 6 to 12 Extras
  • Lighting Director
  • Sound Engineer
  • Camera Operator
  • Continuity
  • Costume Coordinator
  • Props and Set
  • Hair and Makeup
  • Production Assistants
  • Food and Drink

 


A couple of notes:

Continuity will be everyone’s job. Making sure things look the same from take to take.
Costumes will be casual clothing, except for the employees who will need aprons.  We will need a fancy blouse (or 2) to be stained. This will be our big stunt!
Hair and Makeup will just help make sure every one looks good.
Production Assistants will be everyone who is available to grab this or move that.
Food and Drink will bring snacks and water and maybe go get some pizza for lunch.

If you are interested in one of these area, don’t worry about experience, we will all be learning.

One person can do a couple of the jobs listed.  Other jobs will need more than one.

I plan on the morning being used for the crew to get familiar with the equipment and the procedures and for the actors and extras to practice their parts. Filming will begin when we are ready.

Leave a Reply

Your email address will not be published. Required fields are marked *